Override Control | AIChE

Override Control

Generally, two control loops connected to a common final control element; one control loop being normally in control, with the second being switched in by some logic element when an abnormal condition occurs so that constant control is maintained. A technique in which more than one controller manipulates a final control element. The technique is used when constraint control is important.

Go to Process Safety Glossary