The Refinery Risk and Technology Review "RTR" Rule - Major Refinery Impacts and Targeted Solutions

Source: AIChE
  • Type:
    Conference Presentation
  • Conference Type:
    AIChE Spring Meeting and Global Congress on Process Safety
  • Presentation Date:
    April 11, 2016
  • Duration:
    30 minutes
  • Skill Level:
  • PDHs:

Share This Post:

The Refinery “RTR” rule was final as of September 30, 2015.  The ruling is complex with wide-spread consequences for all U.S. Refiners.  The regulations range from new benzene fenceline monitoring, storage tank, marine vessel loading and venting requirements to more complex requirements for key refinery processing units.  Previously exempted startup, shutdown and malfunction (SSM) events must now meet emission limits and other requirements.  This requires the refiner to make careful reviews of operating procedures and history during SSM periods for the Delayed Coking Unit (DCU), Fluid Catalytic Cracking Unit (FCCU), Catalytic Reforming Unit (CRU) and Sulfur Recovery Units (SRU).  Flares must meet new flare requirements which now apply during SSM periods.  Given a compliance deadline of late 2018, the need to install new equipment could result in a compressed EPC schedule to achieve compliance.  This presentation will provide an overview of the new Refinery “RTR” Rule and will highlight cost-effective solutions we have determined for compliance.

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.



Do you already own this?



AIChE Member Credits 0.5
AIChE Members $19.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
Non-Members $29.00