How Big a Future Cracker Should You Consider?

Source: AIChE
  • Type:
    Conference Presentation
  • Conference Type:
    AIChE Spring Meeting and Global Congress on Process Safety
  • Presentation Date:
    March 29, 2017
  • Duration:
    30 minutes
  • PDHs:
    0.50

Share This Post:

The plant capacity of ethylene plants has evolved over more than last six decades. Every time businesses have struggled with the same question - how big a plant can be built? That’s true even today. This overview will focus on:
  • Background and trends in the industry
  • Business drivers and challenges
  • Factors that determine the capacity limit of the ethylene plant
Presenter(s): 
Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Checkout

Checkout

Do you already own this?

Pricing


Individuals

AIChE Member Credits 0.5
AIChE Members $19.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
Non-Members $29.00
Language: