Limited Time Offer

Claim a 25% discount on all eLearning courses (including credentials) with code ELEARN25.

Offer is valid from March 10-31. Public courses excluded from promo. 

Enter to Win!

Take our survey for a chance to win an eLearning course of up to $1,550. Start here

Cracking Furnace Line Flushing Pre-Commissioning

Source: AIChE
  • Type:
    Conference Presentation
  • Checkout

    Checkout

    Do you already own this?

    Pricing


    Individuals

    AIChE Member Credits 0.5
    AIChE Members $15.00
    AIChE Graduate Student Members Free
    AIChE Undergraduate Student Members Free
    Non-Members $25.00
  • Conference Type:
    AIChE Spring Meeting and Global Congress on Process Safety
  • Presentation Date:
    April 28, 2015
  • Duration:
    30 minutes
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

The abundance of low cost shale gas has led to numerous projects in North America to expand existing or construct new ethylene production units.  Most of these projects involve the addition of new furnaces or the revamp of existing furnaces.  The successful startup of these furnaces is dependent on the design, construction and also the pre-commissioning activities to prepare the furnaces for fuel gas and process introduction. 

Pre-commissioning in particular is a critical phase in cracking furnace start-up and line flushing is an important step in the pre-commissioning process.  This paper presents the various methods of line cleaning and flushing, and addresses the many issues to consider during the planning and execution process.

Presenter(s): 
Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Checkout

Checkout

Do you already own this?

Pricing


Individuals

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
Non-Members $25.00
Language: