Resolving Catalytic Soot and Coke Formations Challenges in a Liquefied Natural Gas Plant: Operational Experiences

10th Topical Conference on Gas Utilization
2010 AIChE Spring Meeting
AIChE Spring Meeting and Global Congress on Process Safety
March 21, 2010 - 8:00pm

In an extremely competitive Oil and Gas industry, heat and energy optimisation is a crucial design consideration in plant designs to ensure optimum business performance. One common approach is via the employment of Waste Heat Recovery Unit (WHRU) at the flue gas path of gas turbines. Incompatible WHRU materials and process conditions could potentially lead to conducive environment that promotes unexpected catalytic soot and coke formations that results in severe equipment fouling and integrity concerns, which in turn could adversely impact sustainable plant production. With understanding of factors that promotes conducive environment for catalytic soot and coke formations, these can be avoided and sufficient designs considerations can be made from Project phase in ensuring long term plant availability and utilization.

PETRONAS Liquefied Natural Gas (LNG) Complex; nestled in a small town of Bintulu, in the coastline of Sarawak, Malaysia, consists of three LNG Plants operated as one integrated site. The three plants namely Malaysia LNG (MLNG), Malaysia LNG Dua (MLNG DUA) and Malaysia LNG Tiga (MLNG TIGA) with total LNG deliverable capacity of about 23 million tonnes per annum (mtpa). The first plant, MLNG with three modules (Modules 1, 2 and 3) began operation in 1983. This was followed by the second plant, MLNG DUA, which started its operations in 1994 also with three modules (Modules 4, 5 and 6). The third plant, MLNG TIGA with two modules (Modules 7 and 8) was later integrated with the existing site and came into operations in 2003.

This paper enlightens the accomplishment of the implementation of a redesign of the Regeneration Gas Heater (RGH) in the WHRU in MLNG TIGA to fully resolve catalytic soot and coke formations. Most importantly, this paper shares the lessons learnt from the Root Cause Analysis (RCA) study and the mitigations actions carried out in order to manage the tremendous operational challenges faced by MLNG TIGA team to maximise plant availability, all while working for the long term implementation of the RGH redesign.

This recording is FREE to members of the Fuels and Petrochemicals Division of AIChE. AIChE members may join the Division for only $10. Join F&PD now and return to this page with your new log-in and you will receive this presentation for FREE.
F&PD Members: Simply click on “click here to buy this archived webcast ” below and your ‘0’ price will appear in your shopping cart.
Professional Development Hours
0.5 PDHs
You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

Would you like to access this content?

No problem. You just have to complete the following steps.

You have completed 0 of 2 steps.

  1. Log in

    You must be logged in to view this content. Log in now.

  2. Purchase Technical Presentation

    You must purchase this technical presentation using one of the options below.
    If you already purchased this content recently, please click here to refresh the system's record of ownerships.

Pricing

Credits 0.5 Use credits
List Price $25.00 Buy now
AIChE Members $15.00 Buy now
AIChE Fuels and Petrochemicals Division Members Free Free access
AIChE Undergraduate Student Members Free Free access
AIChE Graduate Student Members $15.00 Buy now
Related Topics: