Cost Effectiveness of 2-Row Membrane System for FLNG

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
One of the most critical issues in engineering and design of FLNG is to reduce top side weight along with its load distribution to the sub-structure. Concentrated top side loads will result in an increase in hull structure costs. The developed 2-row containment system allows flexibility of top side load distribution. This system allows flexible modularization of top side equipment and reduces in hull structure cots as well. This system also provides great benefits in minimization of sloshing effects of the membrane storage FLNG. FLNG storage capacity can be increased with the 2-row system without sloshing problem. This paper presents the cost effectiveness of the 2-row containment system adopted to FLNG.
Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

AIChE MEMBERS

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members** $25.00
  • Type:
    Conference Presentation
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post: