Share Mike Emery, John Ludman, Thomas SandbrookJanuary, 2011Proper design, installation, and maintenance of flanged connection systems can prevent loss of containment and process interruptions. Follow this seven-step approach to ensure reliability of this critical process equipment. Would you like to access the complete CEP Article? No problem. You just have to complete the following steps. You have completed 0 of 2 steps. Log in You must be logged in to view this content. Log in now. AIChE Membership You must be an AIChE member to view this article. Join now. Copyright Permissions: Would you like to reuse content from CEP Magazine? It’s easy to request permission to reuse content. Simply click here to connect instantly to licensing services, where you can choose from a list of options regarding how you would like to reuse the desired content and complete the transaction. More in "Back To Basics" Learn to Effectively Operate and Maintain Pumps December, 2011 Avoid Fluidization Pitfalls December, 2014 Using Chromatography to Separate Complex Mixtures December, 2010 Pump Sizing: Bridging the Gap Between Theory and Practice December, 2016 Applying Mass and Energy Balances to Spray Drying December, 2009 Use Guided-Wave Radar to Measure Water Level in Steam Loops December, 2012 Introduction to Cogeneration Operation November, 2017 Introduction to Fluidization November, 2014 Ten Steps to an Effective Bin Design November, 2013 Stop Knocking Your Condensate Return November, 2016 Wastewater Treatment: Understanding the Activated Sludge Process November, 2009 Cut Agitator Power Costs November, 2012 View all Topics: Plant OperationsProcess Design & Development