Preventing Process Safety Problems of Tomorrow, Today!

  • Type:
    Conference Presentation
  • Duration:
    30 minutes
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

The most cost effective time for implementing process safety design elements is during the planning stages of the project management process. 

Gap: Facilities are designed with less than adequate process safety considerations and the gap is discovered after the facilities are constructed.

Addressing the Gap: Implementing a proper risk assessment strategy ranging from assisting with determining a preferred alternative to the delivery of a “ready for construction” design that has demonstrated that the risks have been managed requires planning, the execution of that plan and the results from the plan deliverables incorporated into the design all along the way

Results / Recommendation: Review some common strategies currently deployed and discuss recommendations for improving the approach.  Proper risk assessment planning for project execution has broad applicability to an enterprise.  Improving this planning step will truly prevent the process safety problems of tomorrow, today…

Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

Pricing

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00