Practical Process Integration Retrofit Part 2. Remaining Problem Analysis

Developed by: AIChE
  • Type:
    Conference Presentation
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

Practical Process Integration Retrofit

Part 2. Remaining Problem Analysis & Driving Force Plot

G.T.Polley

The Cross-Pinch Method is not the only tool derived during the initial stages of the application of Pinch Technology to retrofit projects. Other significant developments were Remaining Problem Analysis and the Driving Force Plot.

References

Tjoe T.N. & Linnhoff B. Using pinch technology for process retrofit, Chem.Engng., 1986 April 28, pp47-60

Ahmad S. & Linnhoff B. Supertargeting: Different process structures for different economics, ASME J.En.Res.Tech., 1989, 111(3), 131-136

Tjoe T.N.  Ph.D. Thesis 1986, UMIST, UK

Panjeh Shahi

Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

Pricing

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00