CEP: Process Safety Beacon - Holiday Operations

Process Safety Beacon
November
2013

Many plants shut down or reduce operations during a holiday period. Equipment may be in a non-standard condition while processes are on hold or shut down. Even though the plant is shut down, it is likely that hazardous materials are still present in storage tanks and process vessels. Equipment that is shut down may be opened for inspection or maintenance. Some plants continue to operate during a holiday but with reduced staff, delaying less-critical activities.

 