Fouling Mitigation of Quench Tower System | AIChE

Fouling Mitigation of Quench Tower System

Type

Conference Presentation

Conference Type

AIChE Spring Meeting and Global Congress on Process Safety

Presentation Date

March 24, 2010

Duration

30 minutes

Skill Level

Intermediate

PDHs

0.50

Gas cracking plants are especially sensitive to fouling in the quench water section. One main fouling mechanism in the quench tower and in the related equipment is the accumulation of material with a high pour point. Fouling can be avoided or at least significantly reduced if the pour point of the hydrocarbon phase can be lowered below process temperatures of the system.

To mitigate fouling for the Borouge Plant in Ruwais, Abu Dhabi, Linde Engineering has built a redistillation unit. In this unit, the heavy hydrocarbon product of the plant is fractionated and a hydrocarbon fraction is routed back to the quench tower for pour point adjustment. Compared to the former performance of the quench tower, measured process parameters indicate that an increased run length of the quench tower can be achieved.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $15.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $25.00
Non-Members $25.00