In 2020 every refinery experienced rate reductions and changing economics. In the Marathon system every FCC unit was taken to minimum and the propylene recovery via the Absorber/Stripper system was maximized. Every unit handled this transition very well but one unit struggled. At minimum rates the unit experienced excessive H2S in the FCC naphtha, no flooding in the Absorber/Stripper system but flooding in the Debutanizer.

The troubleshooting effort included all the typical methods. The root of the problem was found by rating equipment at turndown conditions. The processing problem was a standard Absorber/Stripper problem but the root cause behind the issue was abnormal.

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

AIChE Pro Members $250.00
AIChE Graduate Student Members $250.00
AIChE Undergraduate Student Members $250.00
AIChE Explorer Members $300.00
Non-Members $300.00