Current Myths about LNG

Fuels and Petrochemicals Division
AIChE Spring Meeting and Global Congress on Process Safety
April 29, 2013 - 1:30pm-2:00pm
Since the startup of the first baseload LNG plant (Camel) in 1964, there have been several generations of LNG plant designs.  Each generation can be defined by a noticeable step change in elements of the overall plant configuration.  These steps may include developments in equipment, changes in cooling media, breakthroughs in train throughput, or combinations of changes leading to new industry standards or benchmarks.  Since the first LNG projects with train capacities of less than 1 Mt/a, generations of technical innovations have led to operating trains of nearly 8 Mt/a, and front end engineering designs (FEED) exceeding this current benchmark.

Regardless of the state of the LNG industry, there are often misconceptions regarding the application of new technologies, determination of process configurations, or implementation of project execution strategies to reduce project costs and shorten schedules.  These misconceptions or innocent mistakes, if perpetuated at conferences or reflected in FEED, can be perceived as reality.  These “design and execution myths” will result in less accurate cost estimates or increased technical and execution risk for new projects.

This paper will review LNG technology and project execution myths that could derail the innovation necessary to develop the next generation of LNG projects.  By openly discussing these myths, we can stimulate constructive debate on the challenges facing today’s projects.

Professional Development Hours
0.5 PDHs
You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
Presenter(s): 

Would you like to access this content?

No problem. You just have to complete the following steps.

You have completed 0 of 2 steps.

  1. Log in

    You must be logged in to view this content. Log in now.

  2. Purchase Technical Presentation

    You must purchase this technical presentation using one of the options below.
    If you already purchased this content recently, please click here to refresh the system's record of ownerships.

Pricing

Credits 0.5 Use credits
List Price $25.00 Buy now
AIChE Members $15.00 Buy now
AIChE Fuels and Petrochemicals Division Members Free Free access
AIChE Undergraduate Student Members Free Free access
AIChE Graduate Student Members Free Free access
Related Topics: 
Skill Level: