Asset owners who integrate the process engineering, operations and business lifecycles of their facilities can improve return-on-capital by up to 4%. Use this virtual-asset model (VAM) to optimize your business assets.
September
2002
Do you need additional capacity or better performance from your existing RTO? Here's how to evaluate whether to upgrade the existing unit, purchase a new system, or buy used equipment.
September
2002
Piping and equipment must withstand fires without rupturing. This can be accomplished by properly designing relief and depressurization systems and using passive fire protection,when needed.
September
2002
Use these design charts for preliminary sizing.
September
2002
Construct a raodmap approach for successful completion of a complex project.
August
2002
Finding the throughput of a multiple-unit, multiple-step operation, even when it is relatively uncomplicated, is not always an easy matter. Several equations and graphical aids are provided to help determine yearly capacity.
August
2002
To reap the most benefit from an advanced process control (APC) system, users need to know how to analyze and monitor the APC's performance.
August
2002
Simulation can help to ensure proper design and performance. Checks can be made for possible problems such as cavitation, and the pump and system can be modified to prevent trouble.
August
2002
Follow these steps to prepare a plan that mitigates excess emissions of hazardous air pollutants.