Fouling Mitigation Program Recovers Operating Efficiency and Extends Run Length for Ethylene Plant Oil Quench Tower | AIChE

Fouling Mitigation Program Recovers Operating Efficiency and Extends Run Length for Ethylene Plant Oil Quench Tower

Type

Conference Presentation

Conference Type

AIChE Spring Meeting and Global Congress on Process Safety

Presentation Date

March 16, 2011

Duration

30 minutes

Skill Level

Intermediate

PDHs

0.50

Extension of system run length and maximizing plant throughput will bring substantial profit to olefin producers. The fouling problem in the oil quench tower of the ethylene plant, however, has become a challenge to achieving long run length goals and has even led to unscheduled shutdown or reduced throughput. In addition, viscosity increase in the oil quench tower bottoms can lead to reduced heat transfer efficiency in the bottom heat exchangers and result in additional injection of dilution oil to adjust the viscosity. A solution to fouling has been developed through rigorous analysis of the root causes and lab tests in conjunction with refined applications knowledge to resolve the afore mentioned problems. The article describes the functional mechanism of the antifoulant program with illustrative successful case histories on the effective control of both fouling and viscosity in the oil quench tower.

Presenter(s) 

Once the content has been viewed and you have attested to it, you will be able to download and print a certificate for PDH credits. If you have already viewed this content, please click here to login.

Language 

Checkout

Checkout

Do you already own this?

Pricing

Individuals

AIChE Member Credits 0.5
AIChE Pro Members $15.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $25.00
Non-Members $25.00