April 2014 | AIChE

You are here

April 2014

What Have We Really Learned? (25 Years After Piper Alpha)

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014

Gas Trial for FLNG Nearshore Commissioning

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
Gas trial is the important process to evaluate Cargo System Performance for FLNG Project. Several methods are now being considered and we will...

To Shale or Not to Shale - Refinery Configuration Analysis at the 10000 FT Level While Getting a 100 Ft Level Value Estimate

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
Subject Summary: The spate of closing refineries and the increasing supply of light, clean transport fuel- suitable hydrocarbons from new drilling...

Reliable Technology Selection Links Value Chains: LNG Transfer in FLNG

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
Many onshore LNG projects are struggling with cost-blowout mainly due to construction delays, skilled labor shortage, environmental issues, etc. In...

The Past, Present and Future of LNG

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
In one decade, the gas prospects in North America have gone from dire to exceptional. In 2004, we were scrambling to build import capacity for gas as...

Tube Inserts for Heat Exchangers - Energy Conservation and Run Optimisation

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
The improvement that can be obtained from tube inserts in heat exchangers have been the subject of several studies performed by TOTAL. These studies...

Equations for Flammability Parameters, Pmax and KG

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 2, 2014
The maximum pressure of gas combustion, P max , and the deflagration index, K G ,are very important flammability parameters that are used for risk...

Pages