April 2012 | AIChE

You are here

April 2012

Proven in Use (What's the Quality of Your Data)

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
To perform LOPA's, fault tree analysis, SIL verifications and other quantitative likelihood analyses requires data. As much as everyone wants data,...

Hydrocracking - An Overview

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
The paper will present an overview of the Hydrocracking process as applied in the refineries today. It will cover Mild Hydrocracking, Partial...

How to Safely Operate Multifunctional Pilot Plants - A Case Study At the Dow Chemical Co

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
Located at Dow's Freeport, Texas site, the B-4000 Multifunctional Pilot Plant has safely supported diverse research initiatives related to the...

Process Safety Management Plus or Minus 20 Years - What I Wish I'd Known 20 Years Ago and What We Can't Wait Another 20 Years to Learn

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
Process Safety Management Plus or Minus 20 Years - What I Wish I'd Known 20 Years Ago and What We Can't Wait Another 20 Years to Learn Abstract of...

Anti-Surge Methods for the Base Load LNG Plant Propane Compressor

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
The propane compressor represents a significant capital investment and operating expense of a LNG plant, and is an essential component in providing...

Capital Cost Targeting of Total Site Heat Recovery

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
Heat recovery on Total Site level can provide a considerably high potential for energy saving. It offers additional degrees of freedom for heat...

The optimum design of LNG tank farm layout

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
The optimum design of LNG tank farm layout

An Engineering Approach to the Synthesis of Integrated Distillation Schemes for Systems Involving Difficult Separations

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
An Engineering Approach to the Synthesis of Integrated Distillation Schemes for Systems Involving Difficult Separations D. Jantes Jaramillo, G.T...

Emergency Block Valves

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
An Emergency Block Valves (EBV) is used as a means of isolating flammable or toxic substances in the event of a leak or fire. The installation, and...

Flash Fire From a Hot Combustible Liquid

Conference Presentation
AIChE Spring Meeting and Global Congress on Process Safety
April 4, 2012
A truck driver loading a tanker was fatally injured in a flash fire. The accident occurred at the loading rack of a petroleum refinery. The truck...

Pages