(44a) Estimation of Methanol-Pill Batch Size for Hydrate Prevention in Offshore Oil & Gas Subsea Operations
AIChE Spring Meeting and Global Congress on Process Safety
2017
2017 Spring Meeting and 13th Global Congress on Process Safety
5th International Conference on Upstream Engineering and Flow Assurance
Gas Hydrates, Wax and Asphaltenes II
Monday, March 27, 2017 - 3:40pm to 4:03pm
Estimation of Methanol-Pill Batch Size
for Hydrate Prevention in Offshore Oil & Gas Subsea Operations
by R.Kini
(Chevron), S.Cochran (Chevron) & J.J.Manzano-Ruiz (Bechtel)
ABSTRACT
The oil production from offshore
reservoirs located in deep-water faces substantial risk of subsea-system
plugging by hydrate formation during operations such as dead-oil displacement (DOD)
from a dead-leg flowline into an uninhibited producing flowline. A methanol pill is also used for dewatering gas
carrying flowlines, between incompatible fluids during umbilical flushing and, during
the flowline restart after an unplanned shutdown. Usually the operating company
forgoes continuous injection of hydrate inhibitors (e.g. methanol,
mono-ethylene glycol, LDHI) to avoid hydrocarbon product contamination and minimize
HES risks and operating expenses. Without an inhibitor, a live-oil or a gas
condensate stream could form hydrates during cooldown if it is exposed to an
environment of high pressure and low temperature in the presence of produced
water.
One common practice among deep-water
oil producers is to run uninhibited production operations and, in case of an
unplanned shutdown, the dead-oil displacement procedure is executed to displace
live-oil with dead-oil within the subsea system. The dehydrated and gas-free
dead-oil can withstand a long shutdown at any subsea pressure/temperature
without the risk of hydrate formation and blockage. Once the shutdown
contingency is over, the production of live-oil can be safely resumed into the subsea
system containing dead oil. The DOD operation has to be executed soon after
shutdown, typically within 8-12 hours after the flow stops, even in case of
thermally insulated flowlines. During the DOD operation there is a risk of
hydrate formation at the interface between the dead-oil and the cold and
uninhibited live-oil due to the increase in pressure caused by pumping. To
prevent a potential hydrate issue at this interface a batch of methanol (a
"pill") is pumped ahead of the dead-oil to separate the two streams.
The batch or pill size of methanol is a concern for the operator not only for
cost but because it depletes the limited inventory onboard the topsides, and
contaminates the separated gas and oil downstream to be out-of-spec with the
exported hydrocarbons.
This paper focuses on establishing a criterion
to size the methanol pill to avoid its oversizing while guaranteeing its effectiveness.
The optimum size depends on the mechanism of methanol-phase dispersion by
turbulent diffusion through the phases on both sides of the pill, and by
methanol attrition through a thin-film shed on the pipe wall. This paper estimates
the methanol pill size based on the turbulent mass-transfer and hydraulics. The
basis of the mass-transfer analysis is the momentum- and mass-transfer Reynolds-analogy
to derive a virtual turbulent-coefficient of diffusion K, following G.I.Taylors 1954 seminal
paper.
Examples of
typical DOD operation with a methanol-pill between dead-oil and live-oil were analyzed.
The mixing at the methanol/live-oil interface was modelled based on mass
transfer and hydraulics for flowlines with diameter between 6 and 10 inches.
The resulting error-function concentration distribution yielded mixing layers
ranging between 250 and 600 feet long, depending on the prevailing Reynolds
number. Similar length-scale results were also obtained for the mixing at the
methanol/dead-oil interface. The mixed volume of methanol with dead- and live
oil varies between 25 and 180 bbls in this analysis. The
methanol film-thickness was estimated as a function of Reynolds number and
shear stress. Typical results obtained for the film thickness were in the range
of 1 6 mm depending on Reynolds number, resulting in an attrition volume of
the order of 20 200 bbls.
The
methodology presented in this paper offers a novel approach to estimate
methanol pill sizes based on the fundamentals and operational parameters.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
AIChE Pro Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
AIChE Explorer Members | $225.00 |
Non-Members | $225.00 |