(2d) Demonstration of Postcombustion CO2 Capture with CaO: Status of the CaOling Project | AIChE

(2d) Demonstration of Postcombustion CO2 Capture with CaO: Status of the CaOling Project

Authors 

Sánchez-Biezma, A. - Presenter, Endesa Generación
Ballesteros, J. - Presenter, Endesa Generación
Lopez, J. - Presenter, Foster Wheeler Energía S.L.U
Grasa, G. - Presenter, Spanish Research Council
Abanades, J. - Presenter, Spanish Research Council


Postcombustion CO2 capture using CaO requires a large scale circulating fluidized bed (CFB) reactor as CO2 absorber, operating between 600-700ºC. In addition, a large scale oxy-fired CFBC must be interconnected to this reactor to allow for the decomposition of CaCO3 formed in the carbonator. This allows for a continuous regeneration of the CaO sorbent and the production of a CO2 rich stream suitable for final purification and compression. Despite the known limitations associated to this technology (mainly sorbent deactivation, solid attrition, and high energy requirements in the calciner) clear operating windows have been identified at which the process could be implemented in practice using the know-how on CFBC technology. Theoretical studies on the thermal integration of a carbonation-calcination loop in new and existing power plants have shown that the technology has the potential to achieve a substantial reduction (around 30%) in capture cost and energy penalties with respect to stand-alone oxy-fired systems. Since the solid materials and operating conditions in the CFB units are similar to those present in existing large scale CFBCs, the prospects for a rapid scaling up of the technology are very promising. A rapid development is taking place in recent years by demonstrating the key concepts in laboratory scale test rigs of 10s of kW. However, it is essential to move on to the next phase of pilot testing and validate the results in conditions fully comparable with those expected in large scale units. We describe here the design of a 1 MWth pilot plant to capture 70-95% of the CO2 contained in the flue gas from a 1/150 side stream emitted by an existing 50Mwe CFB power plant. The pilot is made up of two interconnected CFB reactors of 15 m height. The construction of the pilot has been initiated and is expected to enter into full operation in the first half of 2011, providing the necessary experimental results to decide on the launching of an aggressive programme that aims to demonstrate the technology at large scale well before 2020.

Topics 

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

AIChE Pro Members $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
AIChE Explorer Members $225.00
Non-Members $225.00