(69d) Ship-Shore Interaction and LNG Tank Piping Design Considerations
AIChE Spring Meeting and Global Congress on Process Safety
2010
2010 Spring Meeting & 6th Global Congress on Process Safety
10th Topical Conference on Gas Utilization
Professor Cedomir M. Sliepcevich Memorial Session Two - LNG Regasification
Tuesday, March 23, 2010 - 9:30am to 10:00am
This paper intends to discuss one of the most neglected areas in the LNG plants. This area involves the ship-and-shore operating philosophy and interaction and BOG (boil-off gas) management. It involves the design considerations, operating philosophy and safety aspects of the LNG plants. It also discusses the rollover, operating pressure difference between the LNG terminal tanks and LNG carrier in operations. Furthermore, emergency shutdown philosophy and loading system surge management are discussed.
Checkout
This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.
Do you already own this?
Log In for instructions on accessing this content.
Pricing
Individuals
2010 Spring Meeting & 6th Global Congress on Process Safety
AIChE Members | $150.00 |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
Non-Members | $225.00 |
10th Topical Conference on Gas Utilization only
AIChE Members | $100.00 |
AIChE Fuels and Petrochemicals Division Members | Free |
AIChE Graduate Student Members | Free |
AIChE Undergraduate Student Members | Free |
Non-Members | $150.00 |