(69c) Timeline of Sabine Pass LNG Terminal | AIChE

(69c) Timeline of Sabine Pass LNG Terminal

Authors 

Granger, D. - Presenter, Cheniere LNG, Inc.


This paper describes on a month by month basis the timeline of milestones accomplished in Conceptual design, Front End Engineering Design (FEED) both pre-FEED and full-FEED, local, state, and federal permitting, EPC activities for both Phase one and Phase two. Project cost for both phases is summarized. From hindsight, the paper then discusses the strengths and weaknesses of the project. From an engineering perspective the paper discusses important design points that all LNG facilities should be based upon. The paper discusses proven equipment, safety considerations, environmental issues and a common sense approach to obtain community support.

Checkout

This paper has an Extended Abstract file available; you must purchase the conference proceedings to access it.

Checkout

Do you already own this?

Pricing

Individuals

2010 Spring Meeting & 6th Global Congress on Process Safety
AIChE Members $150.00
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
Non-Members $225.00
10th Topical Conference on Gas Utilization only
AIChE Members $100.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Graduate Student Members Free
AIChE Undergraduate Student Members Free
Non-Members $150.00