Restart, Hot Restart | AIChE

Restart, Hot Restart

Restart after power failure which occurs within the process dependent maximum time allowed for the PES to recover as if there had been no power failure. All I/O-information and other dynamic data as well as the Application Program context are restored or unchanged. Restart capability requires a separately powered real time clock or timer to determine elapsed time since the power failure was detected and a user accessible means to program the process dependent maximum time allowed.

Go to Process Safety Glossary

Download the app: iTunes | Google