Changing maintenance and/or operating procedures can significantly increase cooling tower performance without major capital expenditures. Here are some tips for ensuring proper design and operation of major tower components.
Many manufacturing processes are not run as efficiently as they could be. The Six Sigma methodology provides a foundation for continuous improvement and for solving quality, operational, and other problems.
Brendan R. O'Donnel, Bruce A. Barna, Chris D. Gosling
Get the most out of your heat exchanger by evaluating the trade-offs between a one-time expenditure and reduced operating expenses, increased income, and/or longer operating life span. Brendan R. O'Donnell - Bruce A. Barna - Chris D. Gosling -
This method optimizes the existing distillation system and its heat-exchanger network simultaneously, lowering energy consumption and freeing up capacity at a minimum capital investment.
Increasingly, project managers are called upon to employ laser scanning technology. However, little information available to aid with its specification. This article discusses the basics of laser scanning and the parameters that should be included...
Salvaged, remanufactured, refurbished or new-surplus equipment may be a cost-effective option. Here's how to recognize when such devices may no longer meet safety or regulatory requirements.
Wearing the appropriate protective eyewear begins with a thorough safety assessment. These guidelines clarify how to identify hazards and select protective equipment to avoid eye injuries.