Important Notice: Limited Web Access Dec 16 to 18, 2016

AIChE will undertake a routine upgrade of our digital infrastructure over the weekend of December 16-18, 2016. During this period access to certain areas of the website will be limited. Additional information will be forthcoming shortly.

CEP: Process Safety Beacon - Manage Temporary Changes

October
2012

A filter on the suction of a pump frequently plugged. Because of this, the pressure needed to be monitored, both in the field and at the control panel. To minimize installation time for a pressure transmitter, it was decided to install a tap on the existing connection for the local pressure gage and connect a pressure transmitter to this tap. Because of the rush and the temporary nature of the change, it was decided to use tubing for the change. The installation, though accepted as a temporary installation, did not follow appropriate design codes or engineering standards, and no management of change (MOC) review was done.


 

Copyright Permissions: 

Would you like to reuse content from CEP Magazine? It’s easy to request permission to reuse content. Simply click here to connect instantly to licensing services, where you can choose from a list of options regarding how you would like to reuse the desired content and complete the transaction.