Retrofitting Burner Management Systems at Existing Furnaces
This paper presents a pragmatic approach for how to retrofit and safely operate the firing system for an existing cracking furnace.
With respect to safety, the firing system needs to work inside a defined operating window. This has to be ensured at all times in order to avoid mis-operations such as uncontrolled combustion, under-stoichiometric combustion, unstable combustion, and over-firing. Operation outside the operating window could occur because of an operational human error, improper safety controls, or malfunctioning of the equipment. It appears that most furnace explosions occur during special operations like burner light-off and decoke operations.
This paper addresses how the firing system of an existing furnace can be retrofitted such that it complies with the intent of the EN 746-2 or equivalent standard.
To receive your PDH certificate contact certificates@aiche.org or 1-800-242-4363.
Watch the following preview of this presentation.
Would you like to access this content?
No problem. You just have to complete the following steps.
You have completed 0 of 2 steps.
-
Log in
You must be logged in to view this content. Log in now.
-
Purchase Technical Presentation
You must purchase this technical presentation using one of the options below.
If you already purchased this content recently, please click here to refresh the system's record of ownerships.
Pricing
| Credits | 0.5 Use credits |
| List Price | $25.00 Buy now |
| AIChE Members | $15.00 Buy now |
| AIChE Fuels and Petrochemicals Division Members | Free Free access |
| AIChE Undergraduate Student Members | Free Free access |
| AIChE Graduate Student Members | Free Free access |
