Cost Effectiveness of 2-Row Membrane System for FLNG

AIChE Spring Meeting and Global Congress on Process Safety
April 3, 2012 - 12:00am
One of the most critical issues in engineering and design of FLNG is to reduce top side weight along with its load distribution to the sub-structure. Concentrated top side loads will result in an increase in hull structure costs. The developed 2-row containment system allows flexibility of top side load distribution. This system allows flexible modularization of top side equipment and reduces in hull structure cots as well. This system also provides great benefits in minimization of sloshing effects of the membrane storage FLNG. FLNG storage capacity can be increased with the 2-row system without sloshing problem. This paper presents the cost effectiveness of the 2-row containment system adopted to FLNG.
Professional Development Hours
0.5 PDHs
You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
Presenter(s): 

Would you like to access this content?

No problem. You just have to complete the following steps.

You have completed 0 of 2 steps.

  1. Log in

    You must be logged in to view this content. Log in now.

  2. Purchase Technical Presentation

    You must purchase this technical presentation using one of the options below.
    If you already purchased this content recently, please click here to refresh the system's record of ownerships.

Pricing

Credits 0.5 Use credits
List Price $25.00 Buy now
AIChE Members $15.00 Buy now
AIChE Fuels and Petrochemicals Division Members Free Free access
AIChE Undergraduate Student Members Free Free access
AIChE Graduate Student Members $15.00 Buy now