Conference Presentations - 2012 AIChE Spring Meeting and Global Congress on Process Safety

Practical Process Integration Retrofit Part 4. Handling Large Projects

Apr 3, 2012
G. T. Polley
Practical Process Integration Retrofit Part 4. Dealing with Large Projects G.T.Polley The Cross-Pinch Method is suitable for use in identify retrofits when the number of streams is small (the example used in the demonstration of this method had seven streams, Polley [2011]). However, Pinch...

Root Cause Study of Debutanizer Column Operational Upsets

Apr 3, 2012
Feridoun Fahiminia
The NOVA Chemicals Debutanizer Column at the Corunna site experienced operational upsets. Gamma scans revealed that the column had flooded, and upon opening the tower it was found that the bottom trays fouled. An investigation was initiated to identify the root causes of fouling as well as...

Hydrogen Membrane Technology for Ethylene Production

Apr 3, 2012
U (Balu) Balachandran
HYDROGEN TRANSPORT MEMBRANE TECHNOLOGY FOR ETHYLENE PRODUCTION U. (Balu) Balachandran, T. H. Lee, C. Y. Park, and S. E. Dorris Energy Systems Division Argonne National Laboratory Argonne, IL 60439-4838 and Olutoye P. Akinjiola Psage Research, LLC, Macungie, PA 18062 Ethylene, the largest volume...

Cost Effectiveness of 2-Row Membrane System for FLNG

Apr 3, 2012
Herbert Moon
One of the most critical issues in engineering and design of FLNG is to reduce top side weight along with its load distribution to the sub-structure. Concentrated top side loads will result in an increase in hull structure costs. The developed 2-row containment system allows flexibility of top side...

Carbon Capture Ready Heavy Oil Extraction and Upgrading

Apr 3, 2012
Eloy Flores
Carbon dioxide emissions from heavy oil production are typically higher than that of producing conventional crudes. Ultimately, carbon dioxide emissions can make heavy oil production less competitive if regulated. Carbon dioxide emission regulations will affect the overall economics of heavy oil...

Increasing Propane Desuperheater and Condenser Reliability in PT Badak NGL

Apr 3, 2012
Mohammad Arief Setiawan
PT Badak NGL is the operator for natural gas liquefaction at Badak LNG Plant, Bontang, Indonesia. At present PT Badak NGL has 8 Trains. The mode for liquefaction is using the APCI process license. At the first step, Feed Gas is pre-cooled with propane refrigerant, followed by liquefaction process...