Conference Presentations - 2012 AIChE Spring Meeting and Global Congress on Process Safety

Installing a Charge Gas Compressor Booster

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
The Braskem Ethylene Southeast Plant expansion study from 500 MTA to 700 MTA recommended that the charge gas compressor turbine and the 1 st and 2 nd...

Re-Rating Ethylene Plant Equipment for Optimum Results

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
Rerating of turbomachinery equipment installed in ethylene plants is a well established method of improving plant operation, whether it is capacity...

Tutorial: The Chemistry of Refinery Fouling

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
The chemistry of refinery fouling is well enough understood to mitigate nearly all fouling. The key information required are the location of the...

Mixed Fluid Cascade, Experience and Outlook

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
The first Base Load LNG plant, which has been built using the Mixed Fluid Cascade (MFC ® ) process, started up in 2007 at a Norwegian location close...

Useful Tips for Optimal Fired Heater Performance

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
Advanced Process Control Strategies for Process Fired Heaters Fired Heaters are used extensively throughout refineries for heating, vaporization and...

The Economics of Process Measurements

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2012
What is the economic value of a new measuring device in a process plant – a new analyzer, a more accurate flow measurement, an additional temperature...

Pages