AIChE Spring Meeting and Global Congress on Process Safety

Molecular Characterization of Petroleum Streams

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2014
Molecular Characterisation of Petroleum Streams Luyi Liu , Nan Zhang Abstract The highly competitive market in the oil refining industry forces...

Gas Trial for FLNG Nearshore Commissioning

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2014
Gas trial is the important process to evaluate Cargo System Performance for FLNG Project. Several methods are now being considered and we will...

The Past, Present and Future of LNG

AIChE Spring Meeting and Global Congress on Process Safety
Apr 2, 2014
In one decade, the gas prospects in North America have gone from dire to exceptional. In 2004, we were scrambling to build import capacity for gas as...

PM2.5 Modeling Challenges

AIChE Spring Meeting and Global Congress on Process Safety
Mar 31, 2014
Air Dispersion Modeling is usually required to demonstrate compliance with the Ambient Air Quality Standards for PM 2.5 in support of an air permit...

Panelist 1

AIChE Spring Meeting and Global Congress on Process Safety
Mar 31, 2014
PSM Introduction 'Master Class' with two invited speakers Copyright © American Institute of Chemical Engineers. All rights reserved.

PSM Challenge for Unregulated Upstream Facilities

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
Upstream oil and gas facilities are typically exempt from the OSHA Process Safety Management (PSM) standard; however, in light of recent regulatory...

Removal of Heavy Hydrocarbons from Lean Natural Gas

AIChE Spring Meeting and Global Congress on Process Safety
Apr 29, 2013
Removal of heavy hydrocarbons, such as C 6 + from natural gas is essential prior to cryogenic liquefaction in order to prevent freeze-out of these...

Linking SPYRO Rigorous Stream Cracking Model

AIChE Spring Meeting and Global Congress on Process Safety
May 2, 2013
Furnace simulations are currently used in all layers of process control from planning and scheduling down to the APC layer. However in the DCS...

Preventing Process Safety Problems of Tomorrow, Today!

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
The most cost effective time for implementing process safety design elements is during the planning stages of the project management process. Gap:...

CSB Investigation of Chevron Richmond Refinery Fire

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
On August 6, 2012 a hydrocarbon fire occurred at approximately 6:30 p.m. in the crude unit of the Chevron Richmond Refinery in Richmond, California...

Furnace Burner Management Practices within Nova Canada

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
Furnace Burner Management Practices within Nova Canada The focus of this paper will be on the cracking heaters at the NOVA Chemicals Corunna site,...

Composite Fuels Production for Combustion

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
ABSTRACT Goal of the Project The primary goal of the project is the creation of composite fuels for combustion processes containing biomass, coal,...

Lessons Learned From Fire in Air Supply Ducts

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
ABSTRACT Submitted for consideration to the 47 th LPS on Oct 31, 2012 Title: Lessons Learned from Fire in Air Supply Ducts Primary author: Al Waller...

LNG Technology Development at Air Products

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
This presentation will trace the beginning of MCR (mixed components refrigerant) and use of Coil Wound Heat Exchanger, from helium recovery to the...

Blacks Swans, White Swans and Fifty Shades of Grey

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
Last year at the Global Congress for Process Safety we presented a paper entitled, “Beware of the Black Swan: The Limitations of Risk Analysis for...

Process Safety in Power Plants

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
Process Safety is a very common and used topic in the chemical industry. According to CCPS, an incident is reported as a process safety incident if...

Using near Misses to Improve Risk Management Decisions

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
In the process safety literature it is often claimed that the analysis of near-miss incidents can improve process safety performance. However,...

Overview of Boiler Water Treatment and Associated Wastes

AIChE Spring Meeting and Global Congress on Process Safety
May 1, 2013
Overview of Boiler Water Treatment and Associated Wastes Boiler water treatment consists of steps to remove contaminants that will corrode or cause...
Subscribe to AIChE Spring Meeting and Global Congress on Process Safety