Unique Failure Mode for API Seal Plan 76

Safety and Health Division
AIChE Spring Meeting and Global Congress on Process Safety
April 29, 2013 - 2:30pm-3:00pm
Unique Failure Mode for  API Seal Plan 76

Double mechanical seals with a pressure alarm in the containment chamber are commonly used in LPG and other low boiling hydrocarbon that do not condense at the low pressure in the containment chamber.  This seal plan referred to as Plan 76 in API 682 is considered a robust safeguard in preventing catastrophic releases of toxic or flammable materials. 

As stated in API 682, Plan 76 is intended to work as follows. Leakage from the inner seal is restricted from escape by the containment seal and goes out the containment-seal vent. An orifice in the outlet line of the collector restricts flow such that high leakage of the inner seal will cause a pressure increase and trigger the PSH set at a gauge pressure of 0,07 MPa (0,7 bar) (10 psi).

This paper will discuss a unique failure mode of a cartridge seal conforming to API 682 seal Plan 76 which can lead to a catastrophic release of materials, without actuating the seal failure high pressure alarm in the containment chamber. The failure can occur if the set screws holding the seal on the shaft slip. This can lead to change in seal face settings and cause the shaft to rotate within the drive collar and shaft sleeve. The containment hydrodynamic seal, which is not cooled, fails first followed by the failure of the inner seal. When the inner seal fails the containment chamber high pressure alarm does not actuate, as the containment seal has already failed and, flammable material are released to the atmosphere without any warning.

 A case study of a fire, caused by seal failure on a butane pump equipped with a cartridge type dual mechanical seal will be presented. Factors which led to this type of failure, and the critical steps in the replacement and torquing  of the set screws  will be discussed.

Professional Development Hours
0.5 PDHs
You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
Presenter(s): 

Would you like to access this content?

No problem. You just have to complete the following steps.

You have completed 0 of 2 steps.

  1. Log in

    You must be logged in to view this content. Log in now.

  2. Purchase Technical Presentation

    You must purchase this technical presentation using one of the options below.
    If you already purchased this content recently, please click here to refresh the system's record of ownerships.

Pricing

Credits 0.5 Use credits
List Price $25.00 Buy now
AIChE Members $15.00 Buy now
AIChE Undergraduate Student Members Free Free access
AIChE Graduate Student Members Free Free access
Related Topics: