Work-Sharing During Design and Construction of Pilot Plants

Developed by: AIChE
  • Type:
    Conference Presentation
  • Conference Type:
    AIChE Annual Meeting
  • Presentation Date:
    November 8, 2009
  • Skill Level:
  • PDHs:

Share This Post:

You will be able to download and print a certificate for PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
This paper will address the role of the Engineering and Construction Company in the technology transfer and execution of a pilot plant project. The global structure of the major petrochemical and E&C corporations dictates that different phases of a pilot plant project be executed in different offices and countries. This may be the case if the site selection changes during the design or engineering stages. Thus the basic design may be performed near the R&D facilities, the detail engineering in another country, procurement and construction in a third. Proper coordination is essential for the successful execution of the project on time and within budget. Example, lessons learned and pitfalls to be avoided will be presented.&'



Do you already own this?

Log In for instructions on accessing this content.


AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00