Turbomachinery for Mega-Ethylene Plants

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.
Ethylene producers continue to search for ways to improve capital expenditure versus payback ratio and to reduce installation and maintenance costs by benefitting from economies of scale. As ethylene plant outputs increase beyond the 1 million ton per year size, turbomachinery manufacturers must meet the challenges of designing and providing larger and more efficient equipment to satisfy production needs. Manufacturers' track records of engineering and providing equipment for significant large scale production facilities provide the foundation of this transition to ever-increasing production levels. Some areas to consider include compressor and steam turbine design and fabrication, rotor assembly and balancing, performance and mechanical testing, equipment support arrangements, shipping constraints and installation details. This presentation describes some of the potential complexities of the massive equipment involved in what are commonly termed “Mega-Ethylene Plants.”
Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

AIChE MEMBERS

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members** $25.00
  • Type:
    Conference Presentation
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post: