Timeline of Sabine Pass LNG Terminal

Developed by: AIChE
  • Type:
    Conference Presentation
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

This paper describes on a month by month basis the timeline of milestones accomplished in Conceptual design, Front End Engineering Design (FEED) both pre-FEED and full-FEED, local, state, and federal permitting, EPC activities for both Phase one and Phase two. Project cost for both phases is summarized. From hindsight, the paper then discusses the strengths and weaknesses of the project. From an engineering perspective the paper discusses important design points that all LNG facilities should be based upon. The paper discusses proven equipment, safety considerations, environmental issues and a common sense approach to obtain community support.

This recording is FREE to members of the Fuels and Petrochemicals Division of AIChE. AIChE members may join the Division for only $10. Join F&PD now and return to this page with your new log-in and you will receive this presentation for FREE.
F&PD Members: Simply click on “click here to buy this archived webcast ” below and your ‘0’ price will appear in your shopping cart.
Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

Pricing

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Fuels and Petrochemicals Division Members Free
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00