Implementation of PSM In Capital Projects

  • Type:
    Conference Presentation
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

You will be able to download and print a certificate for these PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

It is critical to embed Process Safety Management in the capital project system to help achieve a safe start-up. This is the foundation for assuring safe operations throughout the life of the process, especially in the construction of facilities for high process hazards.

Today's PSM system, practiced by most companies, is Deming-based and is specifically a plan-do-check-act system that strives for continuous improvements.

The capital project process is very different with specific starting and ending points that are driven by cost and time. The result is that all the required tasks for each PSM element are also time-driven, with the objective of having a full PSM program in place at the time of start-up. Additionally, capital projects must achieve designs that meet the balance of competing demands.

This paper explores some of these issues that are critical to achieving on-time start-up, design operating rates, and safe operation with optimum investment and life cycle cost.

Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

AIChE MEMBERS

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00