Comprehensive Quench Water and Steam Generator Management for Optimized Unit Performance

Developed by: AIChE
  • Type:
    Conference Presentation
  • Conference Type:
    AIChE Spring Meeting and Global Congress on Process Safety
  • Presentation Date:
    April 3, 2012
  • Skill Level:
    Intermediate
  • PDHs:
    0.50

Share This Post:

You will be able to download and print a certificate for PDH credits once the content has been viewed. If you have already viewed this content, please click here to login.

In any ethylene plant, the dilution steam generator system remains the most critical component, regardless of feedstock being processed. The recovery of water, and the production of good quality dilution steam can be challenging processes. The quench water and dilution steam generation systems are closely linked and adjusting specific operational procedures and chemical programs can help optimize overall unit performance. This paper will review the fundamental goals for all sections of the system including quench water tower, separator, coalescer, process water stripper and steam generator. Potential problems such as corrosion, emulsification, fouling, and salt entrainment are significant operational problems that can reduce steam production and affect plant efficiency and profitability. Identification of these problems, as well as available operational and chemical solutions will be presented.
Presenter(s): 

Checkout

Checkout

Do you already own this?

Log In for instructions on accessing this content.

Pricing

AIChE Member Credits 0.5
AIChE Members $15.00
AIChE Undergraduate Student Members Free
AIChE Graduate Student Members Free
Non-Members $25.00